PASS S2 ellipse: chart curvature has constant sign (720 samples) min 0.077, max 0.077
PASS S2 ellipse: N1 T(X) = rho_P(X) (72 cases) max err 5.74e-42
PASS S2 ellipse: N2 chart T(X) = I-angular symmetry of Def. 2.4 (72 cases) max err 1.72e-41
PASS S2 oval: chart curvature has constant sign (720 samples) min 0.034683, max 0.1065
PASS S2 oval: N1 T(X) = rho_P(X) (72 cases) max err 0.0
PASS S2 oval: N2 chart T(X) = I-angular symmetry of Def. 2.4 (72 cases) max err 1.15e-41
PASS S2 ellipse: N3 <Bx,x> constant along 300 steps F0 -0.0238085, max deviation 5.43e-39
PASS S2 oval: N4 control, the conic through five points is not invariant max deviation 0.395 (F0 0.205421)
PASS H2 ellipse: chart curvature has constant sign (720 samples) min 0.077, max 0.077
PASS H2 ellipse: N1 T(X) = rho_P(X) (72 cases) max err 7.17e-43
PASS H2 ellipse: N2 chart T(X) = I-angular symmetry of Def. 2.4 (72 cases) max err 1.72e-41
PASS H2 oval: chart curvature has constant sign (720 samples) min 0.034683, max 0.1065
PASS H2 oval: N1 T(X) = rho_P(X) (72 cases) max err 3.59e-43
PASS H2 oval: N2 chart T(X) = I-angular symmetry of Def. 2.4 (72 cases) max err 1.43e-41
PASS H2 ellipse: N3 <Bx,x> constant along 300 steps F0 -0.0320766, max deviation 7.21e-39
PASS H2 oval: N4 control, the conic through five points is not invariant max deviation 0.451 (F0 0.240015)

TOTAL: 16 PASS, 0 FAIL
(running time 25.4 s)
